Amberley District State School Hard Cover

Yamanto, Queensland

Cantilever Roof

21.1m

Hot rolled stick frame, column and rafter cantilever roof

675sqm

Steel column supported, steel rafter fixed hard-cover cantilever roof and purpose-built play area.

XXL CONSTRUCTIONS breathed new purpose into a 'dead-zone' within the school grounds by installing a bespoke custom designed play space and designing and installing a purpose built hard covered structure to protect it and the students using it.

XXL CONSTRUCTIONS undertook the demolition and removal of an old open courtyard, with concrete pathways, garden beds, and half stage, and replaced it with a modern fit-for-purpose custom designed artificial turf games area with full platform [accessible] stage, and bespoke steel cantilever roof to cover and protect not only the beautiful new play/assembly space but the students and faculty using it.

The single point-of-contact, concept to completion, build management solution provided by XXL CONSTRUCTIONS involved the production of design concept drawings, steel detailing drawings, structural drawings, engineering compliance and approval, construction drawings, materials and trade procurement, build management of demolition and removal, excavation, earth works, site preparation, the foundation works, the slab laying, the play-space slab installation, the structural steel frame, roofing and claddin install, the artificial turf laying, the landscaping, and occupancy certification. 

XXL CONSTRUCTIONS are seasoned at enabling schools and sports clubs to provide modern, robust, durable year round [Qld] weather proof coverings for their outdoor sports courts, assembly, and play spaces, to ensure protection for all at all times.  XXL delivers smart, effective, and affordable outcomes with it’s single point-of-contact, concept to completion, build management solution.